Implementation of high-criticality systems for a new logistics facility in a rapidly growing market.
Electrical infrastructure, LV systems, safety lighting, IT networks, monitoring systems, and emergency power solutions.
Case studies
Implementation of high-criticality systems for a new logistics facility in a rapidly growing market.
Electrical infrastructure, LV systems, safety lighting, IT networks, monitoring systems, and emergency power solutions.
Delivering advanced electrical, mechanical, and digital infrastructure for a major container terminal under strict international standards and tight schedules. EPC turnkey delivery of MV/LV systems, reefer power distribution, fibre-optic networks, access control, IP CCTV, and integrated SCADA monitoring.
Redevelopment works for the conversion of the second floor of the S. Andrea Hospital into specialized Dermatology outpatient facilities.
Redevelopment and modernization works for the building systems of the former “Rosolino Pilo Barracks” facility.
Operation and preventive maintenance of HVAC, heating, plumbing and sanitary systems, fire protection installations, submersible and sewage pumping systems, and all electrical infrastructures serving the Torre San Vincenzo complex.
Design and implementation of the HV/MV electrical power supply system and MV/LV distribution substations serving the Maersk terminal platform in Vado Ligure.
Detailed design and execution of works for the conversion of the former Hotel Riviera into university student residences.
Design and implementation of electrical and mechanical systems, including fire protection facilities, industrial water supply infrastructure, and methane gas bypass systems.
Supply, installation, and integration of 40 HC and 20 HC containerized shelter transformer units, including all associated cabling infrastructure, as part of the construction of the new Genoa breakwater.
Engineering and implementation works to achieve Fire Prevention Code compliance for the Ponte dei Mille and Ponte Andrea Doria Cruise Terminals.
Definitive and detailed engineering design for the construction and commissioning of an Onshore Power Supply (Cold Ironing) system, providing medium-voltage shore-side electricity to cruise ships and other vessel types across Sardinian ports.
Definitive and detailed engineering design, followed by the execution of works for the electrification of the RO-RO berth at the Port of Gioia Tauro, implementing shore-side power supply solutions to support port decarbonization.
Engineering and implementation works to achieve Fire Prevention Code compliance for the Ponte dei Mille and Ponte Andrea Doria Cruise Terminals.