Healthcare Facility Conversion

Redevelopment works for the conversion of the second floor of the S. Andrea Hospital into specialized Dermatology outpatient facilities.
Electrical Power Infrastructure

Design and implementation of the HV/MV electrical power supply system and MV/LV distribution substations serving the Maersk terminal platform in Vado Ligure.
Fincantieri Industrial Systems

Design and implementation of electrical and mechanical systems, including fire protection facilities, industrial water supply infrastructure, and methane gas bypass systems.
Containerized Transformer Substations

Supply, installation, and integration of 40 HC and 20 HC containerized shelter transformer units, including all associated cabling infrastructure, as part of the construction of the new Genoa breakwater.
Cruise Terminal Upgrading

Engineering and implementation works to achieve Fire Prevention Code compliance for the Ponte dei Mille and Ponte Andrea Doria Cruise Terminals.